To find how much concrete you need, multiply the length, width and thickness of the slab in feet, then divide by 27 to convert cubic feet to cubic yards. Add 5 to 10% for waste and uneven ground. A 10 × 10 ft slab that is 4 inches thick needs about 1.23 cubic yards, or about 1.36 cubic yards with 10% extra.
Step-by-step: how to calculate concrete for a slab
- Measure length and width in feet. For L-shaped areas, split them into rectangles.
- Convert the thickness to feet. Divide inches by 12: 4 in = 0.333 ft, 6 in = 0.5 ft.
- Multiply length × width × thickness to get cubic feet.
- Divide by 27 to get cubic yards, the unit ready-mix suppliers use.
- Add a waste allowance of 5 to 10%, more if the ground is uneven.
What each step looks like on site
Here is how those measurements look on a real slab, from the empty form to the finished pour.




Concrete needed for common slab sizes
Volumes below are for a 4-inch-thick slab, without waste. Bag counts use about 0.60 cu ft per 80 lb bag and are rounded up.
| Slab size | Cubic feet | Cubic yards | 80 lb bags |
|---|---|---|---|
| 4 × 4 ft | 5.3 | 0.20 | 9 |
| 8 × 8 ft | 21.3 | 0.79 | 36 |
| 10 × 10 ft | 33.3 | 1.23 | 56 |
| 12 × 12 ft | 48.0 | 1.78 | 80 |
| 10 × 20 ft | 66.7 | 2.47 | 112 |
How many bags of concrete are in a yard?
One cubic yard is 27 cubic feet. With typical yields of 0.60, 0.45 and 0.30 cubic feet per bag, that works out to about 45 bags of 80 lb, 60 bags of 60 lb, or 90 bags of 40 lb concrete per cubic yard. Yields vary by brand, so check the bag.
When to order ready-mix instead of bags
Once a pour goes past about one cubic yard, bags become heavy work and it is hard to mix fast enough to keep the slab consistent. Ready-mix trucks deliver the whole volume at once; ask suppliers about minimum orders and short-load fees for small jobs.
Common mistakes
- Forgetting to convert inches to feet before multiplying, which makes the result 12 times too large.
- Measuring depth in only one spot on uneven ground.
- Ordering exactly the calculated amount with no allowance for spillage and form bulges.
This guide covers material quantities only. Slab thickness, base preparation and reinforcement depend on the load and on local building codes; for structural work, consult a qualified professional.